The 2018 Pulse of the Profession®, a global survey conducted by Project Management Institute (PMI), reveals around $1 million is wasted every 20 seconds collectively by organizations around the globe due to the ineffective implementation of business strategy through poor project management practices. This equates to roughly $2 trillion dollars wasted a year.

This press release features multimedia. View the full release here: http://www.businesswire.com/news/home/20180215005610/en/

Organizations that undervalue project management report much higher project failure rates. (Graphic: ...

Organizations that undervalue project management report much higher project failure rates. (Graphic: Business Wire)

The study shows that on average organizations waste 9.9 percent of every dollar* due to poor project performance, and that around one in three projects (31 percent) do not meet their goals, 43 percent are not completed within budget, and nearly half (48 percent) are not completed on time. Alarmingly, executive leaders may be out of touch with this reality, as 85 percent surveyed said they believe their organizations are effective in delivering projects to achieve strategic results. These factors are leading to colossal financial losses for businesses around the world, with a significant broader macro-economic impact.

“Project management is the driver of strategy, but organizations are failing to bridge the gap between strategy design and its delivery,” said Mark A. Langley, President and Chief Executive Officer, Project Management Institute. “Effective project management to implement an organizations’ business strategy is key, and has a significant impact on the bottom line.”

Of the geographic regions included in the survey, China reported the lowest average monetary waste on projects (7.6 percent or $76 million per $1 billion), followed by Canada (7.7 percent or $77 million per $1 billion), and India (8.1 percent or $81 million per $1 billion). Contrarily, Australia reported the highest average waste on project spending at 13.9 percent or $139 million per $1 billion. *Figures are U.S. dollar amounts, but represent a percentage that applies to any currency.

“There is a powerful connection between effective project management and financial performance,” continued Langley. “Organizations that are ineffective with project management waste 21 times more money than those with the highest performing project management capabilities. But the good news is that by leveraging some proven practices, there is huge potential for organizations to course correct and enhance financial performance.”

In an era of increased financial scrutiny, shifting competitive pressures, and business disruption from evolving technology, the survey results point to five critical factors that can help organizations drive performance through more effective implementation of strategy.

1. Executive Sponsor Engagement is the Top Driver of Effective Strategy Delivery

The top driver of projects meeting their original business goals is an actively engaged executive champion or sponsor. But at the same time, organizations report an average of 38 percent of projects not having active executive sponsorship, which points to the need and opportunity for executive leaders to be more engaged in the delivery of strategy.

2. Greater Connection Between Strategy Design and Delivery

Executives often fail to recognize that effective project and program management is what delivers on strategy. More than one in three organizations (35 percent) report not having strong alignment of initiatives and projects that directly deliver against strategy. This indicates the need for C-Suite executives to better recognize the full potential of project management to execute strategy, and to ensure they are leveraging the right programs to directly deliver against strategy.

3. Optimize Investment in Strategy Implementation

Organizations often prioritize investment in developing strategy over proper execution. There appears to be a big disconnect between executive leaders and project managers on strategy implementation funding. While 84 percent of executive leaders believe they are effectively prioritizing and funding the right initiatives and projects, only 55 percent of Project Management Office (PMO) leaders agree. This suggests that organizations might not be leveraging the optimum focus and investment to deliver against strategy.

4. Leverage Disruption – Don’t Just React to It – Get Agile

In a world with an accelerated pace of innovation, disruption is the new normal. So, it’s not surprising that 83 percent of project managers report digital transformation has either moderately or dramatically impacted their work over the past five years. What’s key to success in today’s business environment is leveraging an agile approach with project management and delivering against strategy through ongoing evaluation of shifting market dynamics, new technologies and innovation.

But while 71 percent of organizations report greater agility over the last five years, only 28 percent report having high organizational agility overall. Though agility is increasing, the pace of change is inconsistent. In fact, from a broader organizational perspective, only 40 percent of organizations report prioritizing the creation of a culture receptive to change.

Looking forward, organizations that can leverage disruption and remain agile can drive both financial gain and competitive advantage.

5. Define and Track Success Metrics

The survey showed that on average, around half (52 percent) of projects experience scope creep and roughly half (48 percent) are not delivered on time, leading to huge financial losses. Defining success measures upfront helps ensure projects stay on track, and meet budgets and goals.

The extent to which organizations within different regions are leveraging these project management best practices is reflected in the overall wastage, detailed below from the least to most wastage:

             
$ wastage, least to most     Region     Amount wasted due to poor project performance*
1     China     7.6% or $76M per $1B
2     Canada     7.7% or $77M per $1B
3     India     8.1% or $81M per $1B
4     Middle East     8.5% or $85M per $1B
5     Asia Pacific     8.6% or $86M per $1B
6     Latin America     10.2% or $102M per $1B
6     U.S.     10.2% or $102M per $1B
7     U.K.     10.8% or $108M per $1B
8     EMEA (Europe, Middle East and Africa)     11.7% or $117M per $1B
9     Brazil     12.2% or $122M per $1B
10     Europe     12.7% or $127M per $1B
11     Australia     13.9% or $139M per $1B

*Figures are U.S. dollar amounts, but represent a percentage that applies to any currency.

About the PMI Pulse of the Profession ® Survey

The Pulse of the Profession Survey® was conducted online in October 2017. The report highlights feedback and insights from 4,455 project management professionals, 800 Project Management Office (PMO) directors, and 447 executive leaders from a range of industries, including information technology, financial services, manufacturing, government, energy, healthcare, construction, and telecom around the globe.

About Project Management Institute (PMI)

Project Management Institute (PMI) is the world's leading association for those who consider project, program or portfolio management their profession. Founded in 1969, PMI delivers value for more than three million professionals working in nearly every country in the world through global advocacy, collaboration, education and research. We advance careers, improve organizational success and further mature the project management profession through globally-recognized standards, certifications, communities, resources, tools, academic research, publications, professional development courses and networking opportunities. As part of the PMI family, ProjectManagement.com creates online global communities that deliver more resources, better tools, larger networks and broader perspectives. Visit us at www.PMI.org, www.projectmanagement.com, www.facebook.com/PMInstitute and on Twitter @PMInstitute.

The full Pulse of the Profession Survey® can be viewed at www.pmi.org/Pulse.

Contact information

Project Management Institute
Rick Alcantara, 610-356-4600 x7030
rick.alcantara@pmi.org
or
Jessica Squibb, +1 416-355-7412
jessica.squibb@ketchum.com

Tietoja julkaisijasta

For more than 50 years, Business Wire has been the global leader in press release distribution and regulatory disclosure.

Tilaa tiedotteet sähköpostiisi

Haluatko tietää asioista ensimmäisten joukossa? Kun tilaat mediatiedotteemme, saat ne sähköpostiisi välittömästi julkaisuhetkellä. Tilauksen voit halutessasi perua milloin tahansa.

Lue lisää julkaisijalta Business Wire

Incyte Announces Positive Interim Data from Phase 2 Trial of Pemigatinib, Its Selective FGFR Inhibitor, in Patients with Cholangiocarcinoma21.10.2018 13:45Tiedote

Incyte Corporation (Nasdaq:INCY) announces updated data from its ongoing Phase 2 FIGHT-202 trial evaluating pemigatinib (INCB54828), its selective fibroblast growth factor receptor (FGFR) inhibitor, in patients with advanced/metastatic or surgically unresectable cholangiocarcinoma (bile duct cancer) who failed at least one previous treatment. In patients with FGFR2 translocations who were followed for at least eight months, interim study results demonstrated an overall response rate (ORR) of 40 percent, the primary endpoint, and a median progression free survival (PFS) of 9.2 months, a key secondary endpoint. These results are being presented at the European Society for Medical Oncology (ESMO) 2018 Congress in Munich, Germany in a poster presentation on Sunday, October 21 from 12:45 p.m. CEST to 1:45 p.m. CEST (6:45 a.m. ET to 7:45 a.m. ET). (Location: Hall A3 – Poster Area Networking Hub; Abstract #756P) “We are pleased to share updated interim results from our ongoing FIGHT-202 trial

Servier and Taiho Oncology Announce Phase III LONSURF® Study Has Met Primary and Secondary Endpoints Demonstrating Prolonged Overall Survival and Progression-Free Survival in Patients with Refractory Metastatic Gastric Cancer21.10.2018 12:10Tiedote

Servier and Taiho Oncology, Inc. (U.S.), a subsidiary of Taiho Pharmaceutical Co., Ltd. (Japan), jointly announced today clinical data from the pivotal Phase III TAS-102 Gastric Study (TAGS) evaluating LONSURF® (trifluridine/tipiracil, TAS-102) versus placebo and best supportive care in patients with heavily pre-treated metastatic gastric cancer who have progressed or are intolerant to previous lines of therapy. The study met its primary endpoint of prolonged overall survival (OS) and secondary endpoint measures of progression-free survival (PFS) consistently supported the OS results, as well as continuing to demonstrate the predictable safety and tolerability profile of trifluridine/tipiracil. Data from TAGS was presented by Dr. Hendrik-Tobias Arkenau, Executive Medical Director of the Sarah Cannon Research Institute UK and an investigator for TAGS, at the ESMO 2018 Congress in Munich, Germany during an oral session (Abstract #LBA25). The study results were simultaneously published in

Phase 3 Data on Filgotinib in Biologic-Experienced Rheumatoid Arthritis to Be Presented at 2018 ACR/ARHP Annual Meeting21.10.2018 01:30Tiedote

Gilead Sciences, Inc. (Nasdaq: GILD) and Galapagos NV (Euronext & NASDAQ: GLPG) today announced detailed results from the Phase 3 FINCH 2 clinical trial of filgotinib, an investigational, selective JAK1 inhibitor, in adults with moderately-to-severely active rheumatoid arthritis and prior inadequate response or intolerance to biologic agents. The data, which are being presented as a late-breaking poster at the 2018 American College of Rheumatology/Association of Rheumatology Health Professionals (ACR/ARHP) Annual Meeting in Chicago, suggest filgotinib has a potential role in addressing important unmet needs in the treatment of rheumatoid arthritis. Positive efficacy data from FINCH 2 were previously announced in September 2018. The data show statistically significant improvements in the proportion of patients achieving a range of clinical efficacy endpoints, including the proportion of patients achieving American College of Rheumatology 20 percent (ACR20, primary endpoint), 50 percent

Manchester United and True Religion Launch Denim Range19.10.2018 20:37Tiedote

Manchester United (NYSE:MANU) and luxury denim brand True Religion have collaborated to launch a range of premium club branded denim wear. A first for the club, the new global partnership with the iconic American denim brand will see a range of men’s & women’s co-branded styles go on sale beginning 26th October in the club’s Megastore as well as online via United Direct and truereligion.com & eu.truereligion.com. The exclusive collection features jeans, shirts and jackets, including a highly desirable limited edition denim jacket embroidered with the club’s crest. Fans will have the opportunity to win a selection of clothing from the new range by visiting www.manutd.com/truereligion. Manchester United’s Group Managing Director, Richard Arnold, comments: “True Religion is a well-known, established name in fashion, creating unique designs without compromising on quality. The range we have collaborated on includes the same attention to detail and craftsmanship that has made True Religion

Arch Insurance Announces Strategic Leadership Changes19.10.2018 16:10Tiedote

Arch Insurance today announced that Matt Shulman will assume the newly created role of CEO, Arch Insurance North America, effective January 1, 2019. In this role, he will lead Arch Insurance’s operations in the United States and Canada. He will report to Nicolas Papadopoulo, Chairman and CEO of Arch Worldwide Insurance Group. Mr. Shulman, who has more than 20 years of experience in the insurance industry, has been with Arch Insurance since 2009 and has served as the President and CEO of Arch Insurance Europe since 2016. “Matt brings significant U.S. and international experience to this role. Under his leadership, together with our senior team, Arch Insurance will continue to enhance our value proposition to our customers through a robust, diversified product portfolio, creative solutions and excellent service,” Mr. Papadopoulo said. Arch Insurance has also created a new organizational structure with three Chief Underwriting Officers (CUO) dedicated to specific lines of business. These

Takeda to Present Results from Phase 3 ALTA-1L Trial Highlighting Intracranial Efficacy of ALUNBRIG® (brigatinib) Versus Crizotinib in First-Line Advanced ALK+ Non-Small Cell Lung Cancer19.10.2018 15:00Tiedote

Takeda Pharmaceutical Company Limited (TSE: 4502) today announced that intracranial efficacy data from the Phase 3 ALTA-1L (ALK in Lung Cancer Trial of BrigAtinib in 1 st Line) trial showed improved intracranial progression-free survival (PFS) and intracranial objective response rate (ORR) with ALUNBRIG (brigatinib) compared to crizotinib among anaplastic lymphoma kinase-positive (ALK+) non-small cell lung cancer (NSCLC) patients. Data for these secondary endpoints will be presented in a poster discussion at the European Society for Medical Oncology (ESMO) 2018 Congress on Friday, October 19 at 2:00 p.m. CET in Munich, Germany. These results further support ALUNBRIG as a potential treatment for adults with ALK+ locally advanced or metastatic NSCLC who had not received a prior ALK inhibitor. ALUNBRIG is currently not approved as first-line therapy for advanced ALK+ NSCLC. “ALK+ NSCLC often spreads to the brain, so having options that can clearly demonstrate efficacy both in the brain an

Uutishuoneessa voit lukea tiedotteitamme ja muuta julkaisemaamme materiaalia. Löydät sieltä niin yhteyshenkilöidemme tiedot kuin vapaasti julkaistavissa olevia kuvia ja videoita. Uutishuoneessa voit nähdä myös sosiaalisen median sisältöjä. Kaikki STT Infossa julkaistu materiaali on vapaasti median käytettävissä.

Tutustu uutishuoneeseemme