Horizon Petroleum Ltd. (the “Company” or “Horizon”) (TSXV: HPL) is pleased to report the results of an independent Resource Report prepared by Apex Energy Consultants Inc. (the “Apex Report”), of Calgary, Alberta, on the Company’s recently-acquired and 100%-owned Ledieux Exploration Permit (the “Permit”) in the Aquitaine Basin of south-western France. The Apex Report has been prepared in accordance with the standards contained in the Canadian Oil and Gas Evaluation Handbook reserve definitions that are consistent with the standards of National Instrument 51-101 ("NI 51-101"), to describe and quantify the Contingent Resources and Prospective Resources contained within the Permit.

The valuation was limited to the following scope:

  1. Presenting the discovered Contingent Conventional Natural Gas Resources in the Saucède -1 gas discovery in the Permit; and
  2. Undiscovered Prospective Conventional Natural Gas Resources in the undrilled structures of the Permit, Aquitaine Basin, France.

The key highlights of the Report are as follows:

  • Unrisked Best Estimate Contingent Conventional Natural Gas Resources of 718.7 billion cubic feet.
  • Net Present Value of the Risked Contingent Conventional Natural Gas Resources, discounted at 10%, of US$1.116 billion.

Ledieux Exploration Permit, France

Horizon holds a 100% interest in the Permit, which is located in the Aquitaine Basin of south-western France. The basin contains the largest natural gas fields in France: Lacq and Meillon, which combined have produced 11 TCF of gas to date. Hydrocarbons were sourced from the Lower Jurassic aged shales and marls, and have migrated into Jurassic and Cretaceous aged naturally fractured carbonate reservoirs contained in folded thrust sheets of the Pyrenean fold belt.

Eleven wells have been drilled in the Permit, with two of those wells testing hydrocarbons. Saucede-1 drilled in 1978 by Esso was a gas discovery flowing an average 9 MMscf/d over 19 days. It was placed on production 1981- 1985 and again in 1988 to 1993. The well produced a cumulative 1.85 BCF of gas from Lower Cretaceous and Jurassic aged naturally fractured carbonate reservoirs between 4,200 and 5,410 meters below sea level. Reservoir engineering analysis has indicated significant wellbore damage, caused by overweight drilling fluids and poor completion practices which could have resulted in poor well performance.

A number of leads have also been identified in different thrust sheets that have similar characteristics to the Saucede gas discovery at shallower depths that provide significant upside potential.

The Apex Report

The Apex Report documents the results of its independent evaluation with Tables summarizing the total Company gross and net, unrisked and risked Contingent and Prospective Resource volumes. The volumes were estimated using stochastic techniques.

The “A-2, A-3 and A-4” Reservoirs contain Contingent Conventional Natural Gas Resources as defined in the Canadian Oil and Gas Handbook and summarized below. Based upon Apex’s evaluation, the Saucède-1 well was a discovery well and is located on the downdip edge of an undeveloped gas field. The well was placed on production at an initial rate of 1.5 MMscfd, producing a total of 1.85 Bcf of conventional sweet gas before being shut in at a rate of approximately 0.46 MMscfd. The poor production performance of the well was attributed to the poor operating and completions practices when the well was drilled and tested. Based on the reservoir test data, Apex estimate an initial production rate of 25 – 30 MMscf/d per well with an appropriate completion.

The Saucède-1 well is shown by seismic data to be part of a large structure comprising three separate thrust sheets, and additional Contingent Resources were assigned to the remainder of the A2, A-3 and A-4 reservoirs penetrated by the Saucede-1 well. The main contingencies relate to the future successful completion of new production wells, the development of the gas processing infrastructure and the negotiation to access the regional infrastructure, and gas marketing agreements to sell the natural gas. Approximately 60% of the Contingent Resources are contained in the A2 reservoir between 4,200m and 4,800m. Horizon plans to target the A2 reservoir for an initial development on the Saucede discovery with the deeper A3 and A4 reservoirs being targeted later once cash flow has been established from the A2 reservoir.

The Permit contains other prospects that will require drilling to test the Undiscovered Prospective Resources. There are sufficient geological and geophysical interpretations that in the opinion of Apex Energy Consultants allow for the estimation of a Prospective Resource as defined in the body of the Report:

Prospective Resources are those quantities of petroleum estimated, as of a given date, to be potentially recoverable from undiscovered accumulations by application of future development projects. There is no certainty that any portion of the Resources will be discovered. If discovered, there is no certainty that it will be commercially viable to produce any portion of the resources.

Contingent Resources are those quantities of petroleum estimated, as of a given date, to be potentially recoverable from known accumulations, but the applied projects are not yet considered mature enough for commercial development due to one or more contingencies.

A BOE conversion ratio of 6 Mscf: 1 barrel has been used within the Report. This conversion ratio is based upon an energy equivalency conversion method primarily applicable at the burner tip and does not represent a value equivalency at the wellhead.

Summary of the Report

The Report focuses on the Saucède – 1 gas discovery well, which was drilled to sufficient depth to intersect prospective horizons in the Permit. It was the only well in the Permit to produce from the naturally fractured carbonate reservoirs in the thrust sheets referred to as the A2, A3 and A4 thrust sheets. While the well was successfully drilled it was not successfully completed which had negative impact on the eventual production of conventional natural gas from the well. Conventional Natural Gas refers to natural gas that can be produced from reservoirs using traditional drilling, pumping and compression techniques.

Contingent Resources and Prospective Resources are summarized in Tables 1, and 3 below. The resources are sub-classified as “Development Unclarified” as the project is currently under active evaluation. Apex completed an economic analysis of the Risked Contingent Resources the results of which are summarized in Table 2.

             

Gross (100% WI) Conventional Natural Gas Volumes (Bcf)

     

Unrisked Contingent Conventional Natural
Gas Resources - Development Unclarified

   

Chance of
Development

   

Risked
Contingent
Resources

Reservoir     Low Estimate     Best Estimate     High Estimate     Best Estimate     Best Estimate
(1C) (2C) (3C) (2C) (2C)
"A2" 309.1

510.8

844.3 85% 434.2
"A3" 66.8 102.7 157.9 85% 87.3
"A4"     68.7     105.1     160.8     85%     89.4
Total    

444.7

   

718.7

   

1163

   

85%

   

610.9

Table 1.

       
Discounted NPV of Future Cash Flow (US$ MM)
        0%     5%     10%     15%     20%
Risked                      
Contingent

4,496.4

2,125.0

1,116.2

634.1

381.5

Resources                                

Table 2.

 

Prospective Resources were assigned to two undrilled structures in the Permit that were not previously tested by drilling. These present significant upside potential to the Permit:

 
Gross (100% WI) Conventional Natural Gas Volumes (Bcf)
Prospect      

Unrisked Prospective Recoverable
Conventional Natural Gas Resources

   

Chance of
Discovery

   

Chance of
Development

   

Risked Prospective
Recoverable Conventional
Natural Gas Resources

      Low Estimate     Best Estimate     High Estimate     Best Estimate     Best Estimate     Best Estimate
"A1 Prospect" 282.8

476.0

804.8 17% 90%

74.7

"D Prospect"      

141.4

    239.7     406.6     13%     90%     28.8
Total       424.2     715.7     1211.5     15%     90%     103.5
Table 3.
 

Exploration and Development Strategy for the Permit

The French government has recently stated that it will no longer issue exploration permits. As well, the extension of current concessions will be gradually limited until they are phased out by 2040. The French government has also recently stated that it plans to pass legislation this year to phase out all oil and gas exploration and production by 2040.

This will not impact the Permit because it is an existing exploration permit. Furthermore, the Company intends to meet its financial commits on the Permit, which would ensure its continuance. Horizon management will be meeting with representatives of the BEPH (Bureau Exploration-Production des Hydrocarbures) in Paris in October, to discuss the Company's plans for its Permit.

The Permit presents an opportunity to appraise and potentially develop Contingent Conventional Natural Gas Resources in a basin with ample existing gas infrastructure, and a well-developed gas market. Management and Directors of Horizon have expertise and experience in appraising, developing and monetizing naturally fractured reservoirs around the world with a number of oil and gas companies. Horizon’s strategy is to leverage that experience to target, acquire, develop and monetize these permits as well as similar gas resources in Europe. The scale of the target resource plays is such that they are immaterial to the large independents and major oil and gas companies but highly material to junior independents that have the technical and operating expertise and experience. The permits in France represent the first step in executing this strategy, and management has identified a number of potential follow up opportunities with significant undeveloped gas resources.

About Horizon Petroleum Ltd.

Calgary-based Horizon is focused on the appraisal and development of oil & gas reserves internationally. The Management and Board of Horizon consist of oil & gas professionals with significant international experience.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

This press release contains "forward-looking statements" or "forward-looking information" (collectively referred to herein as "forward-looking statements") within the meaning of applicable securities legislation. Such forward-looking statements include, without limitation, forecasts, estimates, expectations and objectives for future operations that are subject to a number of assumptions, risks and uncertainties, many of which are beyond the control of Horizon. Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by the words "expects", "plans", "anticipates", "believes", "intends", "estimates", "projects", "potential" and similar expressions, or that events or conditions "will", "would", "may", "could" or "should" occur or be achieved. This press release contains forward-looking statements pertaining to, among other things Horizon’s ability to meet its obligations regarding the Permit and otherwise maintain the Permit and the furtherance of Horizon’s European acquisition and development strategy.

Forward-looking information is based on current expectations, estimates and projections that involve a number of risks, which could cause actual results to vary and in some instances to differ materially from those anticipated by Horizon and described in the forward-looking information contained in this press release.

Certain of the "risk factors" that could cause actual results to differ materially from the Company's forward-looking statements in this press release include, without limitation, changes of laws or regulations; the ability to implement business strategies or to pursue business opportunities, whether for economic or other reasons; status of the world markets, prices and price volatility; state of capital markets and ability to raise capital; litigation; the commercial and economic viability of the extraction technology the ability to Horizon to extract resources or develop on the Permit, reliance on suppliers, contractors, consultants and key personnel, risks associated with compliance with environmental protection laws and regulations.

Although Horizon believes that the material factors, expectations and assumptions expressed in such forward-looking statements are reasonable based on information available to it on the date such statements were made, no assurances can be given as to future results, levels of activity and achievements and such statements are not guarantees of future performance.

Contact information

Horizon Petroleum Ltd.
Dr. David Winter, +1-403-984-2444
President & CEO
david.winter@horizon-petroleum.com
or
David R. Robinson, +1-403-399-9047
VP Business Development
david.robinson@horizon-petroleum.com

Tietoja julkaisijasta

For more than 50 years, Business Wire has been the global leader in press release distribution and regulatory disclosure.

Tilaa tiedotteet sähköpostiisi

Haluatko tietää asioista jo ennen kuin ne uutisoidaan? Kun tilaat tiedotteemme, saat ne sähköpostiisi yhtä aikaa suomalaisen median kanssa. Tilauksen voit halutessasi perua milloin tahansa.

Lue lisää julkaisijalta Business Wire

First Westinghouse AP1000® Nuclear Plant Sanmen 1 Completes Initial Criticality21.6.2018 23:24Tiedote

Westinghouse Electric Company, China State Nuclear Power Technology Corporation (SNPTC) announced today that the world’s first AP1000 nuclear power plant located in Sanmen, Zhejiang Province, China has successfully completed initial criticality. “Today we completed the final major milestone before commercial operation for Westinghouse’s AP1000 nuclear power plant technology,” said José Emeterio Gutiérrez, Westinghouse president and chief executive officer. “We are one step closer to delivering the world’s first AP1000 plant to our customer and the world – with our customers, we will provide our customers in China with safe, reliable and clean energy from Sanmen 1.” Following initial criticality will be connection to the electrical grid. Once plant operations begin at Sanmen 1, it will be the first AP1000 nuclear power plant in operation, offering innovative passive safety system technology, multiple layers of defense and advanced controls for unequaled reliability and safety. Commentin

Westinghouse Loads Fuel in Second AP1000® Nuclear Power Plant21.6.2018 23:07Tiedote

Westinghouse Electric Company and its customers, China State Nuclear Power Technology Corporation (SNPTC) and Shangdong Nuclear Power Company Limited (SDNPC) announced today that Haiyang Unit 1, the AP1000 nuclear power plant located in Haiyang, Shandong Province, China, has begun to load fuel. “This is a great day for Westinghouse, our China partners and the nuclear industry. Haiyang Unit 1 continues to demonstrate our ability to deliver safe, innovative solutions for power generation,” said José Emeterio Gutiérrez, Westinghouse president and chief executive officer. He added, “Westinghouse will continue to deploy AP1000 technology throughout the world and demonstrate our technical leadership in the nuclear energy industry.” Fuel load at Haiyang Unit 1 commenced at 7:36 p.m. (GMT+8) today. Earlier this summer, in preparation for fuel load, Haiyang Unit 1 successfully completed the necessary testing and regulatory reviews conducted by China’s National Nuclear Safety Administration (NNS

Pharnext to Announce Top-Line Results from the Pivotal Phase 3 Trial of PXT3003 for the Treatment of Charcot-Marie-Tooth Type 1A Disease by October 201821.6.2018 21:23Tiedote

Regulatory News: Pharnext SA (Paris:ALPHA) (FR0011191287 - ALPHA), a biopharmaceutical company pioneering a new approach to the development of innovative drug combinations based on big data genomics and artificial intelligence, today announced an update from its ongoing Phase 3 clinical program (PLEO-CMT and PLEO-CMT-FU studies) evaluating PXT3003 for the treatment of Charcot-Marie-Tooth type 1A disease (CMT1A) in adults. Top-line results from the pivotal PLEO-CMT study are now expected by October 2018. Prof. Daniel Cohen, M.D., Ph.D., Pharnext’s Co-Founder and Chief Executive Officer said: “We are thrilled to bring this Phase 3 clinical trial to completion and we now expect to disclose top-line results by October of this year. Our PLEODRUG™ PXT3003 has already shown initial signals of efficacy in our Phase 2 trial in CMT1A. We are hopeful we can bring this much-needed therapy to patients suffering from this debilitating condition, as they currently have limited therapeutic options, mo

Philip Morris International Makes Call to Creative, Media and Communications Communities21.6.2018 21:13Tiedote

Philip Morris International Inc. (“PMI”) (NYSE: PM), today announced a bold call to action for the creative, media and communications communities to embrace its ongoing commitment to creating a smoke-free world. As part of this initiative, PMI will offer smoke-free alternatives wherever we can, including heated tobacco products and e-cigarettes, to current smokers in the industry who would otherwise continue to smoke. During a keynote at the PMI Science Lounge at The Cannes Festival of Creativity, SVP of Communications Marian Salzman said, “We are asking the creative community to join us in raising awareness of the potential of science, technology and innovation for those who smoke and the people around them.” The move is part of PMI’s vision to lead the charge towards greater innovation and technology in the tobacco industry, all of which is backed by science. Agencies interested in joining the movement can contact Marian Salzman at marian.salzman@pmi.com. “People who smoke deserve in

IBC2018 Announces Cyber Security Forum to Help Media Tackle Cyber Threats21.6.2018 19:30Tiedote

IBC2018, the world’s most influential media, entertainment and technology show, today announces a Cyber Security Forum to expand its position as the preeminent cyber security destination for broadcasters and media. The event will form part of the prestigious annual IBC show at the RAI in Amsterdam from Thursday 13 to Tuesday 18 September 2018, which last year attracted more than 57,000 attendees from 170 countries. The Cyber Security Forum is one-day, invitation-only event that will convene Chief Technology Officers, Chief Information Officers, Chief Information Security Officers and Chief Digital Officers within media and broadcasting for a conversation on the challenges and opportunities presented by cyber security for broadcasters. Attendees will discuss how to anticipate the next cyber threat, how to manage a breach and how to prepare for the future of cyber security. The Cyber Security Forum sits alongside the Telco & Media Innovation Forum and Leaders’ Forum as part of IBC’s Exec

Mensia Technologies Raises 1,3 Million Euro to Introduce Koala Neurofeedback as a Revolutionary Medical Device in Europe21.6.2018 19:23Tiedote

Mensia Technologies, french MedTech start up, leads the new booming category of Digital therapeutics with its revolutionary « at home « neurofeedback, to train the brain and cure neuropsy disorders without drugs. Co-founder INRIA-IT2, existing shareholders and now HARA, which are business angels experts in medical device category, joined this fund raise. BPI de Rennes is also part of this tour. Mensia Technologies, borned out of INRIA in 2012. The IT expert labs in Rennes are computing real time signaling softwares. The neurofeedback technique is non invasive, at home and without drugs. MENSIA KOALA treats ADHD, Attention Deficit Disorders with or without Hyperactivity, children and adolescents. This unique medical device is a therapeutic video game on an interactive tablet connected to the brain activity. Children learn to control their attention by exercising 3 times a week during 4 months of treatment. Visual feedback given during the game, allows the children to learn, control and

Uutishuoneessa voit lukea tiedotteitamme ja muuta julkaisemaamme materiaalia. Löydät sieltä niin yhteyshenkilöidemme tiedot kuin vapaasti julkaistavissa olevia kuvia ja videoita. Uutishuoneessa voit nähdä myös sosiaalisen median sisältöjä. Kaikki STT Infossa julkaistu materiaali on vapaasti median käytettävissä.

Tutustu uutishuoneeseemme