Business Wire

Bentley Systems Acquires Synchro Software to Extend Digital Workflows for Infrastructure Project Delivery Through 4D Construction Modeling

Jaa

Bentley Systems, Incorporated, a leading global provider of comprehensive software solutions for advancing infrastructure, today announced the acquisition of Synchro Software, headquartered in London, leader (and the market creator) in 4D construction modeling software, for scheduling and project management. Synchro, “construction’s time machine,” has been globally adopted, in particular, for building and civil infrastructure projects. The acquisition broadens Bentley’s ProjectWise construction offerings—which already include ConstructSim, the leader for 4D construction modeling in project delivery of industrial plants. With construction project management in 4D, benefits of BIM can extend throughout infrastructure project delivery and asset lifecycles, as traditionally disconnected workflows become digital workflows.

This press release features multimedia. View the full release here: https://www.businesswire.com/news/home/20180620005867/en/

Synchro 4D construction modeling of Crossrail Station. Image courtesy of Bentley Systems

Synchro 4D construction modeling of Crossrail Station. Image courtesy of Bentley Systems

Synchro’s strong growth, since the introduction of Synchro PRO in 2007, has coincided with the burgeoning adoption of BIM for design workflows—which, however, stop short of considering construction planning, scheduling, and project management strategies. For London’s Crossrail, Synchro digital construction innovatively applied Bentley Systems’ iModel work packaging to complete the reach of its BIM application portfolio and its CDE. Crossrail, the largest European construction project over this period, is now being completed on time and on budget. Synchro has increasingly become the standard for major constructors leveraging BIM through project delivery. Synchro’s 2018 4D Digital Construction Conference in Amsterdam brought together infrastructure construction thought leaders from 18 countries, including presentations by Royal BAM Group, Mortenson Construction, Robins & Morton, Shanghai Construction No. 4 Group, Skanska UK, and Larsen & Toubro, who shared their benefits achieved through innovatively applying 4D construction modeling with Synchro.

In industrial project delivery, characterized by EPC (engineer-procure-construct) contracting, integrated processes are already the norm—leading to ConstructSim’s digital workflows for advanced work packaging. However, in vertical buildings and civil infrastructure projects, notwithstanding the advancement of BIM for design and engineering, prevalent design/bid/build contracting has institutionalized disconnected workflows isolating construction planning from BIM data and geometry.

  • Constructors have been constrained by the limitations of stand-alone planning and scheduling programs, without digital visibility into the engineering information coalesced within the separate 3D BIM environment;
  • construction planning typically lacks the workface-level granularity and depth of detail, and exploration of sequencing alternatives, to sufficiently minimize risk and schedule variance; and
  • constructors characteristically need to create their own independent 3D models to serve construction only, in the process orphaning the BIM deliverables which can then never, despite their engineering intelligence, accurately represent the as-built asset for operations and maintenance.

Within Synchro, 3D BIM deliverables are linked with the 4D time dimension to intrinsically and immersively synchronize, through digital workflows, the construction strategy, work breakdown structure, schedule, costs, resources, supply chain logistics, and progress. Synchro’s 4D construction modeling appropriately incorporates other construction variables (human, materials, equipment, falseworks, and space) for safe, reliable, and predictable project delivery performance. Synchro includes intrinsic CPM scheduling, or users can maintain external project schedules.

By synchronizing changes from BIM, schedule and/or field conditions, Synchro provides clear visibility into both the project data and the design, making it quick and easy to communicate and analyze the impact of changes on the entire project delivery process. This also enables Synchro users to compare construction strategy alternatives—even in early stages of design and bid processes—and to evaluate the feasibility and efficiency of different scenarios, deriving insights toward the best possible construction outcomes.

By incorporating Synchro 4D construction modeling through the ProjectWise CDE, infrastructure project delivery can now benefit from unprecedented digital workflow advancements. For the first time, change synchronization can assure that BIM deliverables are updated for changes which occur during construction, aligning the as-designed, as-constructed, and as-operated digital engineering models to improve both project performance and asset performance. And, in particular for civil infrastructure projects, constructioneering digital workflows can automate direct relationships between the project’s digital engineering models, the continuously-surveyed digital context of site conditions before and during construction, and positioning devices controlling construction equipment and feeding back as-built conditions.

“I’m very excited about what Synchro brings to Bentley’s capabilities for comprehensive project delivery, not only in terms of technology, but also by virtue of the proven construction expertise of the Synchro team, led by the vision and advocacy of Tom Dengenis,” said Stephen Jolley, vice president of construction for Bentley. “In construction modeling for industrial projects, the market is already converging around ConstructSim’s advanced work packaging and workface planning. In the advancement of going digital for civil and building construction, the needed impetus for these ‘industrialized’ advantages is precisely what we are now announcing. For infrastructure projects, integrating Synchro’s 4D construction modeling completes the reach of our ProjectWise CDE.”

Tom Dengenis, CEO of Synchro Software, said, “This combination reflects my conviction about what’s imperative for finally driving infrastructure construction substantially forward. At Synchro, we accomplished the breakthrough of 4D construction modeling software many years ago, but we have wanted to advance the market faster than our own continuous growth. With my 40+ Synchro colleagues in the UK, Boston, San Francisco, Shanghai, and Moscow, I look forward to working more directly with our new Bentley colleagues, thanks to our now so much greater combined power and commitment, to accelerate the global industry in going digital.”

Malcolm Taylor, head of technical information, Crossrail, said, “Using specialist software from Bentley Systems and Synchro, our project schedule could be linked to the 3D information to produce 4D models that could show the progress of design and installation at any particular point in time. Using 4D models to plan helped speed up the project teams’ understanding of what we needed to do and when. They could also tease out conflicts that were not normally apparent from regular Gantt charts and drawings. Using the 4D model for construction progress also manages payment expectations as it allows teams to readily agree on what’s completed and accepted—as well as producing an excellent as-built record for the future maintainer. For me, the news of Bentley Systems’ acquisition of Synchro Software is excellent, and will help reinforce how 4D can be used to improve construction management.”

Bentley Systems’ CEO Greg Bentley said, “Synchro has already inflected upward the construction productivity curve, by leading the adoption of 4D construction modeling for significant projects worldwide. The opportunity to extend digital workflows from BIM to institutionalize 4D construction modeling across infrastructure project delivery, superseding disconnected planning and scheduling, is enormous and immediate; its magnitude is confirmed by the clamor of new startups. Tom Dengenis’ informed enthusiasm and business foresight in anticipating and advancing the market’s potential—reflected in Synchro’s sustained and increasing growth from critical mass to escape velocity—assures me that we now, uniquely, have the right combined team and converged technologies. Every constructor and every infrastructure project can gain from going digital through our 4D construction modeling!”

About Synchro

Synchro Software, Ltd. provides digital construction software and services that improve the safety, reliability, predictability and quality of complex construction projects. Their 4D digital construction platform serves the global market, combining traditional Gantt chart CPM scheduling with integrated 4D visualization capabilities in real time. Their customers range from small consultants to the world's largest and most recognizable contractors, subcontractors, owners, and suppliers using Synchro on high-profile, complex construction projects. For more information visit www.synchroltd.com.

About Bentley Systems

Bentley Systems is a global leader in providing engineers, architects, geospatial professionals, constructors, and owner-operators with comprehensive software solutions for advancing the design, construction, and operations of infrastructure. Bentley users leverage information mobility across disciplines and throughout the infrastructure lifecycle to deliver better-performing projects and assets. Bentley solutions encompass MicroStation applications for information modeling, ProjectWise collaboration services to deliver integrated projects, and AssetWise operations services to achieve intelligent infrastructure – complemented by comprehensive managed services offered through customized Success Plans.

Founded in 1984, Bentley has more than 3,500 colleagues in over 50 countries, and is on track to surpass an annual revenue run rate of $700 million. Since 2012, Bentley has invested more than $1 billion in research, development, and acquisitions. www.bentley.com

Related Images:

Airport screenshot.jpg – Synchro PRO 4D model of airport construction project

Pull Planning.jpg – 4D Pull Planning in Synchro PRO

Crossrail Station.jpg – Synchro 4D construction modeling of Crossrail Station

Photo attribution: Images courtesy of Bentley Systems

Bentley, the Bentley logo, AssetWise, ConstructSim, MicroStation, and ProjectWise are either registered or unregistered trademarks or service marks of Bentley Systems, Incorporated or one of its direct or indirect wholly owned subsidiaries. All other brands and product names are trademarks of their respective owners.

Contact information

Bentley Systems, Incorporated
Press Contact:
Jennifer Maguire, +1 610 458 2695
jennifer.maguire@bentley.com
Follow us on Twitter: @BentleySystems

Tietoja julkaisijasta

For more than 50 years, Business Wire has been the global leader in press release distribution and regulatory disclosure.

Tilaa tiedotteet sähköpostiisi

Haluatko tietää asioista jo ennen kuin ne uutisoidaan? Kun tilaat tiedotteemme, saat ne sähköpostiisi yhtä aikaa suomalaisen median kanssa. Tilauksen voit halutessasi perua milloin tahansa.

Lue lisää julkaisijalta Business Wire

Emmaus Life Sciences Announces the New England Journal of Medicine has Published the Phase 3 Trial Results of Endari™ (L-Glutamine Oral Powder) in Sickle Cell Disease19.7.2018 00:45Tiedote

VIEW E-MEDIA KIT – Emmaus Life Sciences, Inc. (Emmaus) announced today that the New England Journal of Medicine (NEJM) has published the results of its 48-week phase 3 clinical trial of Endari™ (L-glutamine oral powder) which supported the FDA approval in July 2017 to reduce the acute complications of sickle cell disease in adult and pediatric patients 5 years of age and older. The article reports results that showed significantly fewer sickle cell crises in those receiving Endari compared to placebo by 25 percent; p=0.005 (median 3 vs. median 4) and significantly fewer hospitalizations by 33 percent; p=0.005 (median 2 vs. median 3). Additional findings showed lower cumulative days in hospital of 41 percent; p=0.02 (median 6.5 days vs. median 11 days) and a lower incidence of acute chest syndrome (ACS) by more than 60 percent; p=0.003 (13 of 152 patients [8.6%] had at least 1 ACS compared with 18 of 78 in the placebo group [23.1%]). The most common adverse reactions, occurring in great

Tigo Releases State-of-the-art Wireless Technology – Mesh – as the New Solar Communication Architecture for the TS4 Platform18.7.2018 22:41Tiedote

Tigo®, pioneer of the smart modular Flex MLPE platform, today announced the release of its new Mesh communication architecture. This state-of-the-art wireless technology directly translates to customer benefits – including simplifying the solar design process and accelerating the commissioning steps. The complete Tigo solution uses a simple yet powerful data collection technology that covers the widest ranges of residential & commercial installations at the lowest cost. With Mesh and the recently announced Tigo Access Point (TAP), customers eliminate the need to address any roof obstruction or orientation constraint. To learn more about Mesh and TAP, register for Tigo’s free, online webinar “The Future of Solar is Wireless” on Wednesday July 25th, 2018 at 10am PDT. This press release features multimedia. View the full release here: https://www.businesswire.com/news/home/20180718005827/en/ Mesh is Tigo's proprietary software that allows each TS4 unit to act as a repeater, extending the

ViiV Healthcare Shares Data from Landmark 2-Drug Regimen Trials At AIDS 201818.7.2018 20:21Tiedote

ViiV Healthcare, the global specialist HIV company majority owned by GSK, with Pfizer Inc. and Shionogi Limited as shareholders, will be presenting over 20 abstracts, including data from the landmark GEMINI 1 & 2 clinical trials, at the 22nd International AIDS Conference (AIDS 2018), 23-27 July 2018, in Amsterdam, The Netherlands. The data being presented this year has a strong focus on novel exploratory therapeutic options and innovative treatment strategies, as well as improving awareness and understanding of key issues that continue to affect the HIV community. John C Pottage, Jr, MD, Chief Scientific and Medical Officer, ViiV Healthcare, commented, “As we see advancements in the treatment options available to people living with HIV, our research efforts over the past few years have been focused on moving beyond viral load and addressing some of the unresolved issues that people living with HIV face, such as the potential long-term risks and toxicities that can be associated with li

Xilam: H1 2018 Revenue: +50%18.7.2018 19:00Tiedote

Regulatory News: The Xilam Group (Paris:XIL) posted consolidated H1 2018 revenue of EUR 13,866 thousand, an increase of 50%. This increase represents an excellent performance, as it follows on the heels of growth of 54% in H1 2017. Revenue for the first part of this financial year breaks down as follows. In thousands of euros 30.06.2018 (1) 30.06.2017 Change New productions 8,465 4,571 +85% Catalogue 5,385 4,652 +16% Other 16 16 +0% Revenue and subsidies 13,866 9,239 +50% (1) Unaudited data. Remarkable success for new releases +85% Excellent H1 growth was driven by the two main businesses, New Productions and Catalogue. In New Productions, H1 deliveries generated record revenue of EUR 8,465 thousand, an 85% increase compared with H1 2017, and confirmed Xilam’s position as a major European animation company. Catalogue revenue was up 16% compared with H1 2017, thanks again to traditional TV channels and digital platforms, in both France and abroad. A fast-paced delivery schedule Thanks t

Department for International Trade: Life Sciences at the Heart of UK Economy18.7.2018 15:38Tiedote

The Government will today (Wednesday 18 July) host the second in a series of roundtables with stakeholders from key life science businesses, demonstrating the importance of the sector to the UK economy. The Chancellor, International Trade Secretary, Business Secretary and Health and Social Care Secretary will be amongst those that meet with senior representatives from leading UK and international life sciences companies as the UK positions itself as the global home of health innovation, welcoming overseas investment and seeking to boost exports in the process. Discussions at the roundtable will focus on how the future of the Life Sciences sector will be supported by the delivery of our modern Industrial Strategy, ensuring that the UK is ‘open for business’ with a positive business environment, our ambitions for a comprehensive agreement with the EU on our future relationship and the development and implementation of our independent trade policy. To date, the government has engaged sign

Universal Laser Systems Expands Its Materials Database with 3M, Victrex and Dexmet Materials18.7.2018 15:05Tiedote

Universal Laser Systems (ULS) announces the addition of 3M™, Victrex® and Dexmet materials to its materials database, the most extensive repository of laser material processing parameters for materials in the range of 10 watts to 500 watts. The 3M, Victrex and Dexmet materials new to the ULS materials database were specifically added for laser processing with the ULTRA and XLS platforms, suited for high accuracy and precision laser cutting, laser ablation and laser surface modification. The materials include: 3M™ Extreme Sealing Tape 4412N 3M™ Thermally Conductive Silicone Interface Pad 5516 Victrex® APTIV® PEEK Film Dexmet PolyGrid® 8PTFE10-125ST Expanded PTFE Dexmet MicroGrid® AL 25 Expanded Aluminum Laser processing notes, describing the results of the laser-material interaction for these materials, are also available in the Materials Library on the ULS website to help potential customers explore the advantages of deploying laser technology within their manufacturing, research and d

Uutishuoneessa voit lukea tiedotteitamme ja muuta julkaisemaamme materiaalia. Löydät sieltä niin yhteyshenkilöidemme tiedot kuin vapaasti julkaistavissa olevia kuvia ja videoita. Uutishuoneessa voit nähdä myös sosiaalisen median sisältöjä. Kaikki STT Infossa julkaistu materiaali on vapaasti median käytettävissä.

Tutustu uutishuoneeseemme