ELY Centre to improve the environmental friendliness and service level of ferry traffic in the Finnish Lakeland
The procurement decision states that a decision has been made to award a service contract to tender winner company Torghatten Nord As.
A total of two tenders were submitted for the tendering process for the procurement of road traffic ferry services at the twelve ferry sites in Lakeland Finland. A tender was entered by Finland Archipelago Shipping Ltd and Torghatten Nord As. The comparison prices of the tenders were:
- Torghatten Nord As 282 472 904,32 €
- Suomen Lauttaliikenne Oy 351 356 970,24 €
The ELY Centre for Southwest Finland has decided, by means of a procurement decision made on 1.12.2022, to award a service contract to the winning company Torghatten Nord As. The procurement decision is not yet legally valid.
The procurement decision itself has not yet established a contractual relationship between the ELY Centre and the winning tenderer. This will be established once both parties have signed a contract. The procurement contract can be signed no earlier than 14 days from now.
The procurement highlights efficiency and green choices
The procurement decision made now for the 12 ferry sites in the Finnish Lakeland is part of the procurement strategy, which will result in the renewal of ferry fleet, a substantial improvement to the environmental friendliness of ferry traffic and in the elimination of weight restrictions at ferry sites. The contract to be concluded later will contribute to a transition to environmentally-friendly and low-emission transport and will promote cost-efficiency through new hybrid ferry technology. Carbon dioxide emissions from transport will decrease by at least 50% from their average level in 2010-2015, while ferry capacity will increase and service quality will improve.
The procurement in the Finnish Lakeland will be the first of the four 20-year service packages, and in 2023-2027 procurements will be continue to be made for the other three procurement packages. In 20-year procurements and contracts, consideration is given to the possibility of implementing eight nationally profitable bridge sites and replacing ferry traffic with a bridge during the contract period. The long-term objective of the contracts is to develop transport towards a carbon-neutral transport service and to meet transport demand and develop ferry traffic as part of an efficient transport system. The contracts will apply to all 40 ferry sites on public roads, comprising four clear entities:
- Road traffic ferry service Finnish Lakeland 2025-2045
- Road traffic ferry service Archipelago Sea I (cable ferries) 2027-2047, competitive tendering 2023
- Road traffic ferry service Archipelago Sea II (ferry vessels) 2030-2050, competitive tendering 2025
- Road traffic ferry service (geographically fragmented ferry sites) 2031-2051, competitive tendering 2027
The capacity and transmission capacity of ferry traffic at the 12 ferry sites in the Finnish Lakeland will change at the following ferry sites, as the now tendered long-term transport contract enters into force in 2025-2027:
Hanhivirta, Enonkoski
The load capacity of the ferry will increase from 70 tonnes to 90 tonnes.
Hirvisalmi, Juuka
The load capacity of the ferry will increase from 60 tonnes to 90 tonnes.
Improvements and modifications of the ferry fairway must be carried out at the ferry site in the next few years so that a larger ferry can start operating at the ferry site.
Hätinvirta, Puumala
The load capacity of the ferry will increase from 60 tonnes to 90 tonnes.
Improvements and modifications of the ferry fairway must be carried out at the ferry site in the next few years so that a larger ferry can start operating at the ferry site.
Kietävälä, Puumala
The load capacity of the ferry will increase from 60 tonnes to 80 tonnes.
Koivukanta, Savonlinna
The load capacity of the ferry will increase from 60 tonnes to 90 tonnes.
Improvements and modifications of the ferry fairway must be carried out at the ferry site in the next few years so that a larger ferry can start operating at the ferry site.
Kortesalmi, Kuopio
The load capacity of the ferry will increase from 60 tonnes to 90 tonnes.
The shoreline at the ferry site must be modified in 2023-2025 so that a larger ferry can start operating at the ferry site.
Kuparonvirta, Mikkeli
The load capacity of the ferry will increase from 60 tonnes to 80 tonnes.
Kyläniemi, Ruokolahti
The load capacity of the ferry will increase from 60 tonnes to 90 tonnes.
The shoreline at the ferry site must be modified in 2023-2025 so that a larger ferry can start operating at the ferry site. A backup ferry site will be built at the same ferry site.
Lamposaari, Lappeenranta
The load capacity of the ferry will increase from 44 tonnes to 80 tonnes.
The shoreline at the ferry site must be modified in 2023-2025 so that a larger ferry can start operating at the ferry site.
Puutossalmi, Kuopio
The load capacity of the ferry will increase from 130 tonnes to 180 tonnes.
The shoreline at the ferry site must be modified in 2023-2025 so that a larger ferry can start operating at the ferry site.
Rongonsalmi, Puumala
The load capacity of the ferry will increase from 44 tonnes to 80 tonnes.
Tappuvirta, Savonlinna
The load capacity of the ferry will increase from 60 tonnes to 90 tonnes.
Further information: ELY Centre for Southwest Finland, Road Engineer Tapani Jaakkola, tel. +358 295 022 808, tapani.jaakkola@ely-keskus.fi
Keywords
About ELY-keskukset
ELY-keskukset ovat valtion viranomaisia, jotka edistävät alueellista kehittämistä hoitamalla valtionhallinnon toimeenpano- ja kehittämistehtäviä alueilla. ELY-keskukset hoitavat elinkeinoihin, työvoimaan, osaamiseen sekä liikenteeseen ja infrastruktuuriin että ympäristöön ja luonnonvaroihin liittyviä tehtäviä. ELY-keskukset kehittävät ja tukevat taloudellista, sosiaalista ja ekologisesti kestävää hyvinvointia.
Subscribe to releases from ELY-keskukset
Subscribe to all the latest releases from ELY-keskukset by registering your e-mail address below. You can unsubscribe at any time.
Latest releases from ELY-keskukset
Varsinais-Suomen ELY-keskus on antanut yhteysviranomaisen lausunnon Norsk e-Fuel AS:n suunnitteleman sähköisen lentopolttoaineen tuotantolaitoksen YVA-ohjelmasta, Rauma (Varsinais-Suomi, Satakunta)2.7.2025 15:33:51 EEST | Tiedote
Varsinais-Suomen ELY-keskus on antanut yhteysviranomaisen lausunnon Norsk e-Fuel AS:n Raumalle suunnitteleman sähköisen lentopolttoaineen tuotantolaitoshankkeen ympäristövaikutusten arviointiohjelmasta eli YVA-ohjelmasta.
Ansökan om ersättning för sälskador öppen till utgången av augusti1.7.2025 10:00:00 EEST | Pressmeddelande
Jord- och skogsbruksministeriet har öppnat ett tidsbundet ansökningsförfarande för ersättning för sälskador inom Europeiska havs-, fiskeri- och vattenbruksfonden. Ansökningstiden pågår till den 31 augusti 2025. Ersättningar kan sökas för skador som sälar orsakat under 2024. Ansökningarna behandlas av NTM-centralen i Lappland och NTM-centralen i Egentliga Finland.
Määräaikainen hyljekorvaushaku on auki elokuun loppuun1.7.2025 10:00:00 EEST | Tiedote
Maa- ja metsätalousministeriö on avannut Euroopan meri-, kalatalous- ja vesiviljelyrahaston hyljekorvausten hakumenettelyn. Haku päättyy 31.8.2025. Korvauksia voi hakea hylkeiden aiheuttamista vahingoista vuodelta 2024. Hakemukset käsittelee Lapin ja Varsinais-Suomen ELY-keskukset.
Försöksprogrammet för återvinning av näringsämnen fortsätter ända till år 202726.6.2025 11:00:00 EEST | Pressmeddelande
Riksdagen har vid plenum 19.6.2025 godkänt ombudgetering av anslaget som har beviljats för forsknings-, utvecklings- och innovationsprojekt i försöksprogrammet för återvinning av nä-ringsämnen.
Ravinteiden kierrätyksen kokeiluohjelma jatkuu vuoteen 2027 saakka26.6.2025 11:00:00 EEST | Tiedote
Eduskunta on hyväksynyt täysistunnossaan 19.6.2025 Ravinteiden kierrätyksen kokeiluohjel-malle TKI-hankkeisiin myönnetyn määrärahan uudelleenbudjetoinnin
In our pressroom you can read all our latest releases, find our press contacts, images, documents and other relevant information about us.
Visit our pressroom