Business Wire

Norge Mining plc - Publication of Mineral Resource Estimate

17.2.2021 10:00:00 EET | Business Wire | Press release

Share

Norge Mining plc, the UK-based exploration company focused on Norway, announces the publication of a maiden Mineral Resource Estimate for the Øygrei area, which confirms the world-class1 characteristics of the Company’s Bjerkreim Exploration Project in south west Norway.

Highlights

  • Maiden Mineral Resource Estimate of 1.55 billion tonnes, containing mean grades of 1.74% phosphorus pentoxide, 4.95% titanium dioxide and 0.07% vanadium pentoxide.
  • This is a world-class resource of EU Critical Raw Materials, defined as materials of strategic importance for the European economy but for which the EU currently relies on imported supply, and could potentially support a mine life in excess of 50 years.
  • Exploration work at Øygrei is ongoing with the aim of improving the understanding of, and extending, the mineral resource.
  • During the past two years, Norge Mining has completed more than 25,000m of drilling throughout the Bjerkreim Exploration Project, building on earlier work by the Norway Geological Survey (NGU). The Company expects to report a maiden Mineral Resource Estimate for the Høyland area in the coming months following analysis of information collected from ongoing drilling in that area.
  • The Mineral Resource Estimate at Øygrei was prepared according to the JORC2 reporting standard by SRK Exploration Services Ltd (SRK), part of the SRK Group, which is an independent international mining, exploration and environmental consultant.
  • The Øygrei Mineral Resource Estimate is summarised below:

Mineral Resource Classification

Tonnes (millions)

P2O5 Grade (%)

TiO2 Grade (%)

V2O5 Grade (%)

Indicated

800

1.84

4.98

0.07

Inferred

750

1.63

4.91

0.07

Total

1,550

1.74

4.95

0.07

John Vergopoulos, Chief Executive Officer of Norge Mining, said:

“The publication of this Mineral Resource Estimate marks a major milestone for Norge Mining. It confirms that Øygrei alone, which forms a small part of our Bjerkreim Exploration Project, contains a world-class deposit of vanadium, titanium and phosphate. These three minerals are all on the EU’s list of Critical Raw Materials, giving Norway a major opportunity to play a pivotal strategic role in the future supply of these materials.

“Exploration work is ongoing to upgrade and extend the resource at Øygrei, which is just 10 sq km of our total licence area. We are carrying out extensive exploration work in other areas of the Bjerkreim project and expect to announce further Mineral Resource Estimates in the coming months.”

An executive summary of the Øygrei Mineral Resource Estimate is available at the Company’s website: www.norgemining.com

Background to the Bjerkreim Exploration Project

The Bjerkreim Exploration Project is located in the large Bjerkreim-Sokndal Layered Intrusion, which has been widely studied by the Norway Geological Survey (NGU) and other researchers. Norge Mining is focusing on the Bjerkreim Lobe of this intrusion, which forms a large synclinal trough structure. This trough extends at outcrop for some 20km northwest-southeast and up to 10km northeast-southwest. It is known to extend for several kilometres in depth.

The mineralisation consists of primary magmatic mineral assemblages in which vanadium-bearing magnetite, ilmenite (titanium) and apatite (phosphate) represent the minerals of interest. Vanadium, titanium and phosphate are all on the EU’s list of Critical Raw Materials, defined as materials of strategic importance for the European economy but for which the EU currently relies on imported supply.

Through its Norwegian subsidiary Norge Mineraler AS, Norge Mining has 46 exploration licences in south west Norway, totalling more than 400 sq km. During the past two years, the Company has conducted extensive ongoing exploration work at Bjerkreim, including channel sampling, aerial surveys and shallow and deep drilling. In total, more than 25,000m of drilling has been completed.

Øygrei represents one of the areas in the Bjerkreim Exploration Project and is the first area to have reached the stage where a Mineral Resource Estimate can be reported. Øygrei lies on the northern limb of the trough structure where several mineralised zones converge closely.

SRK Exploration Services Ltd (SRK), part of the SRK Group, an international mining, exploration and environmental consultant, has prepared the Mineral Resource Estimate, which brings together the three zones at Øygrei: Zone B, Zone C and New Zone. The diamond drilling programme at Øygrei began in May 2020 and the data cut-off used to produce the resource estimate was 31 December 2020. The data derived from 4,787 assay samples from 24 drill holes.

Øygrei Mineral Resource Estimate

SRK’s initial Mineral Resource Estimate for the Øygrei area of the Bjerkreim Exploration Project, reported according to the JORC Code reporting standard, is summarised below:

Mineral Resource Classification

Tonnes (millions)

P2O5 Grade (%)

TiO2 Grade (%)

V2O5 Grade (%)

Indicated

800

1.84

4.98

0.07

Inferred

750

1.63

4.91

0.07

Total

1,550

1.74

4.95

0.07

The table shows that the total indicated and inferred mineral resource at Øygrei is 1.55 billion tonnes, which could potentially support a mine life in excess of 50 years.

The vanadium, phosphate and titanium grades are relatively consistent within the three layers that comprise the mineral resource but vary between the layers. Most notably one of the layers, the New Zone, contains a very low phosphate grade (0.11% P2O5) while the other two layers, termed B Zone and C Zone, have mean grades of 1.83% P2O5 and 2.15% P2O5 respectively. These two zones together comprise some 1.3 billion tonnes of the total mineral resource and so there would be potential to prioritise the processing of these zones during the mine life and maintain a higher P2O5 feed grade for a significant period. This will be assessed further as part of the planned Scoping Study.

In reporting a mineral resource, there is a requirement that there are reasonable prospects for eventual economic extraction. In this case, the requirement has been achieved by limiting the tonnage reported to that falling within an open pit which was optimised assuming selling prices of USD230/t of ilmenite, USD97.75/t of phosphate and USD9.2/lb of V2O5.

Exploration Target

Norge Mining’s exploration work at Øygrei is ongoing to upgrade and extend the resource. Given the work to extend the resource, SRK has delineated an exploration target, also as defined by the JORC Code, of between 1 and 2 billion tonnes of mineralisation with similar grades to that already reported (between 1.5 and 2% P2O5, 4.5 and 5.5% TiO2 and 0.05 and 0.09% V2O5).

This exploration target is based on the assumed continuity of the mineralised layers at Øygrei to the northwest and at depth and has yet to be confirmed by drilling albeit that there is surface geology to support this and the mineralisation drilled to date remains open in these directions. It should be noted that the exploration target potential tonnage and grade estimates are conceptual in nature, that there has been insufficient exploration to estimate a mineral resource and that it is uncertain if further exploration will result in the estimation of a mineral resource.

Next Steps

Exploration work at Øygrei is ongoing with a substantial, planned programme of 14,000m of additional drilling. Data from this drilling work will be used to upgrade and extend the resource and also to provide information for a scoping study, which is expected to begin shortly, to give an initial financial appraisal of the development of Øygrei. The drilling work and scoping study are expected to be completed this year. Norge Mining is also carrying out ongoing exploration work elsewhere in the Bjerkreim Exploration Project.

1 World-class deposit is used in the context of this announcement to mean a deposit of very large size with the potential to provide major economic and strategic benefits.

2 The reporting standard for this statement is the 2012 edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” as published by the Joint Ore Reserves Committee of the Australasian Institute of Mining and Metallurgy, Australian Institute of Geoscientists and Minerals Council of Australia” (the “JORC Code”). The JORC Code is a reporting code which has been aligned with the Committee for Mineral Reserves International Reporting Standards (“CRIRSCO”) reporting template and is an internationally recognised reporting standard that has been adopted worldwide for market-related reporting and financial investments.

The Competent Person who has overall responsibility for the Mineral Resource is Dr Mike Armitage, C.Eng, C. Geol, FGS, MIMM, PhD. Dr Armitage is a Chartered Geologist which is a Recognised Professional Organisation (“RPO”) included in a list promulgated by the Australian Securities Exchange (“ASX”) from time to time. He is a full time employee of SRK Consulting (UK) Ltd and a director of SRK Exploration Services, a corporate consultant and has over 35 years’ experience in the mining and metals industry and also has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the JORC Code. Dr Armitage has been responsible for the reporting of Mineral Resources and Ore Reserves on various properties internationally during the past 30 years.

About Norge Mining plc

Norge Mining plc is a UK-based natural resources company focused on mineral exploration in Norway.

The Company owns 46 exploration licences, totalling more than 400 square kilometres in south-west Norway in an area known to contain vanadium, titanium, phosphate and gold. Norge Mining is currently conducting a programme of exploration work to produce a resource estimate, building on earlier studies by the Norway Geological Survey (NGU).

Norge Mining’s ambition is to become a substantial, sustainable and strategically important exploration and mining business focused on Norway.

The Company was founded in November 2018, is headquartered in the UK and has a 100%-owned Norwegian subsidiary, Norge Mineraler AS.

For further information, please visit www.norgemining.com

To view this piece of content from cts.businesswire.com, please give your consent at the top of this page.

Contact information

For media enquiries, please contact:
Buchanan Communications +44 (0) 20 7466 5000
Mark Court / James Husband norgemining@buchanan.uk.com

About Business Wire

For more than 50 years, Business Wire has been the global leader in press release distribution and regulatory disclosure.

Subscribe to releases from Business Wire

Subscribe to all the latest releases from Business Wire by registering your e-mail address below. You can unsubscribe at any time.

Latest releases from Business Wire

Vedanta Aluminium’s Q2FY27: Profit doubles to INR 6,187 Cr, EBITDA rises 83% YoY31.10.2026 15:12:00 EET | Press release

Vedanta Aluminium Metal Limited (BSE: 544780 & NSE: VAML), India’s largest aluminium producer, announced its unaudited financial results for the quarter and half year ended 30 September 2026, delivering solid financial and operational performance. Revenue increased to INR 22,066 crore, up 41% YoY, supported by higher volumes and improved marketing mix. EBITDA stood at INR 10,192 crore, up 83% YoY, with an EBITDA margin of ~46%. Profit after tax stood at INR 6,187 crore, more than doubling YoY with an increase of 105%. VAML strengthened its balance sheet during the quarter, reducing net debt by INR 3,090 crore QoQ, with Net Debt/EBITDA improving to 0.7x from 0.9x in Q1FY27. The company’s credit profile was validated with India Ratings upgrading its credit rating to AA+ (Stable), alongside rating reaffirmations from ICRA and CRISIL. Operationally, VAML achieved its highest-ever quarterly aluminium production of 649 KT, up 3% QoQ and 5% YoY. Value-added production reached a record 432 KT,

United States Signs Participation Contract for Expo 2030 Riyadh, Strengthening Momentum For Global Participation31.10.2026 10:38:00 EET | Press release

The United States of America has signed its Participation Contract for Expo 2030 Riyadh, marking a significant milestone in the World Expo’s preparations and further strengthening the momentum for international participation in the global event. This press release features multimedia. View the full release here: https://www.businesswire.com/news/home/20261031669001/en/ The Participation Contract was signed by His Highness Prince Faisal bin Farhan Al Saud, Minister of Foreign Affairs of the Kingdom of Saudi Arabia, and U.S. Secretary of State Marco Rubio, during a bilateral meeting held on the sidelines of the 2026 G20 Foreign Ministers’ Meeting in Atlanta, Georgia. The signing marks an important step in the United States’ journey towards Expo 2030 Riyadh, paving the way for the development of its pavilion, programming and visitor experience. It also reinforces the growing international commitment to Expo 2030 Riyadh, as countries move from confirming their participation to actively sha

ADNEC Group Kickstarts November with Two of the World’s Largest Events in the Energy and Tourism Sectors31.10.2026 05:53:00 EET | Press release

ADNEC Group, a Modon company, begins November by hosting two of the world’s most significant international events in the same week. ADIPEC 2026, the world’s largest energy event, takes place at ADNEC Centre Abu Dhabi from 2 to 5 November. Meanwhile, World Travel Market (WTM) London, one of the global travel industry’s leading gatherings, takes place at the Group’s Excel London venue from 3 to 5 November. This press release features multimedia. View the full release here: https://www.businesswire.com/news/home/20261030918463/en/ ADNEC Centre Abu Dhabi (Photo: AETOSWire) The two events, held simultaneously at the Group’s largest venues in the UAE and the UK, reflect ADNEC Group’s capability to deliver large-scale international events across multiple markets. ADIPEC has grown alongside the venue since it was first held at the ADNEC Centre Abu Dhabi in 2006. This year’s edition is set to be the largest in the event’s history, occupying the venue’s entire 153,000 square metres of exhibition

SES and Air Astana Introduce Multi-orbit Inflight Connectivity on A321LR Fleet30.10.2026 19:35:00 EET | Press release

SES was selected by Air Astana, the award-winning flag carrier of Kazakhstan, to introduce next-generation inflight connectivity services across its Airbus A321LR fleet. The first connected aircraft entered commercial service on 29 October 2026. Fleet-wide deployment will continue across the remaining A321LR fleet. Equipped with SES’s new electronically steered array (ESA) antenna, the aircraft delivers reliable connectivity over the SES multi-orbit network. SES will provide a fully managed inflight connectivity service across the fleet, enabling Air Astana passengers to enjoy a seamless online experience throughout their journey. “Airlines are increasingly looking for connectivity solutions that deliver a seamless passenger experience while providing the flexibility to evolve with changing customer expectations,” said Blane Boynton, Senior Vice President, Aviation at SES. “SES's multi-orbit solution will enable Air Astana to offer a consistent, high-quality online experience across it

CIRCOR to Expand Industrial Portfolio with Acquisition of Green Silence Group S.p.A.30.10.2026 18:06:00 EET | Press release

CIRCOR, a KKR portfolio company and global manufacturer of flow control products for industrial and naval markets, today announced that it has signed a definitive agreement to acquire Green Silence Group S.p.A., an Italian provider of hydraulic pumps, electric motors and advanced engineering solutions. The acquisition will bring together the complementary capabilities of Settima, Motive and Spin expanding CIRCOR’s Industrial portfolio with three-screw and ultra-low-noise hydraulic pumps, Motive electric motors, high-efficiency rare-earth-free motor technologies, power electronics and advanced engineering capabilities. Together, these technologies will broaden CIRCOR’s ability to deliver integrated solutions that improve system efficiency, reduce energy consumption and critical raw materials dependency, and address evolving customer needs across industrial and mobile applications. The combination will also provide Green Silence Group access to CIRCOR’s global commercial and operational

In our pressroom you can read all our latest releases, find our press contacts, images, documents and other relevant information about us.

Visit our pressroom
World GlobeA line styled icon from Orion Icon Library.HiddenA line styled icon from Orion Icon Library.Eye